What this work involves
Identify doors, cabinets, sanitary fittings or equipment attached to the wall. Coordinate floor, external-wall and ceiling junctions.
- Wall type and thickness
- Sound and any fire function
- Doors and built-in provisions
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Defer vulnerable final finishes until investigation and disruptive repairs are complete.
What the drawing needs to explain
Create a phase drawing with three colours: repair now, improve later and investigate first. Mark where phases meet, such as roof edges, service routes and finished floors.
How to review the result
Check both completed work and preparations for the next phase. Record which connections are deliberately temporary and when they will be reassessed.
Cost factors for this service
Costs depend on wall length, height, performance and finish. Ask for the scope and selected specification to be described separately.
Bring this to the discussion
Photographs of the existing situation, available drawings and your requirements for partition & internal walls. Identify the elements that should remain.
Questions about the work
What should I discuss before arranging partition & internal walls?
A lightweight partition does not suit every load. Heavy fixings require provisions designed in advance.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.