What this work involves
Do not disturb suspect material. Establish the survey, notifications and qualified contractors required for the particular situation.
- Survey report
- Scope and qualified contractor
- Clearance and subsequent scheduling
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Show dependencies between repairs, insulation and services in the plan.
What the drawing needs to explain
Create a phase drawing with three colours: repair now, improve later and investigate first. Mark where phases meet, such as roof edges, service routes and finished floors.
Decide this before construction
Address assessed causes of defects before new finishes conceal them. Plan comfort measures together with ventilation and necessary access to building services.
Compare the complete intervention
Request both direct costs and temporary provisions for each phase. Include additional removal and reinstatement when phasing otherwise appears cheaper than one coordinated intervention.
Cost factors for this service
Costs depend on investigation, material type, access and removal scope. Ask for the scope and selected specification to be described separately.
Bring this to the discussion
Photographs of the existing situation, available drawings and your requirements for asbestos surveys & removal planning. Identify the elements that should remain.
Questions about the work
What should I discuss before arranging asbestos surveys & removal planning?
The required process depends on materials and work. No in-house asbestos certification is claimed; the appointed specialist must be confirmed beforehand.
Official background: Dutch Government (Dutch).
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.