What this work involves
Discuss moisture, flatness, floor build-up and any underfloor heating. Include existing doors, skirtings and transitions.
- Species and pattern
- Floating or bonded installation
- Finish and maintenance
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Defer vulnerable final finishes until investigation and disruptive repairs are complete.
What the drawing needs to explain
Create a phase drawing with three colours: repair now, improve later and investigate first. Mark where phases meet, such as roof edges, service routes and finished floors.
How to review the result
Check both completed work and preparations for the next phase. Record which connections are deliberately temporary and when they will be reassessed.
Cost factors for this service
Costs depend on area, timber selection, substrate and laying pattern. Ask for the scope and selected specification to be described separately.
Bring this to the discussion
Photographs of the existing situation, available drawings and your requirements for parquet & timber flooring. Identify the elements that should remain.
Questions about the work
What should I discuss before arranging parquet & timber flooring?
Suppliers should confirm compatibility with underfloor heating. Agree the build-up and use of the selected system.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.

